Engineering a High-Capacity Secondary Fluid Network
for Mission-Critical Infrastructure

Project Overview

Delivering Precision-Engineered Liquid Cooling Infrastructure

This is a high-capacity, Tier IV Data Centre project designed to support mission-critical infrastructure with a cooling capacity of 28.8 MW across approximately 86,500 sq. ft.

SFN Solutions’ scope encompasses the complete Secondary Fluid Network (SFN) for Coolant Distribution Units (CDUs), covering approximately 2.5 km of piping, associated piping accessories and on-site execution.

The project involves detailed engineering coordination, LOD 400 Building Information Modelling (BIM), multidisciplinary clash detection and collaborative project coordination through Autodesk Construction Cloud (ACC).

Through integrated engineering, BIM-led coordination and precise execution, the project focuses on developing a reliable and well-coordinated secondary cooling distribution infrastructure.

Project Scope & Technical Specifications

Infrastructure Type: Tier IV Data Centre

Cooling Capacity: 28.8 MW

Data Centre Area: ~86,500 sq. ft.

Total Piping: ~2.5 km

Cooling Infrastructure: Secondary Fluid Network for CDUs

BIM Modelling: LOD 400

Clash Detection: Multidisciplinary

Collaboration Platform: Autodesk Construction Cloud (ACC)

Our Scope of Work

Complete Secondary Fluid Network Engineering & Execution

SFN Solutions is responsible for the secondary fluid distribution infrastructure supporting the CDU cooling system.

Our project scope includes:

01. Secondary Fluid Network Infrastructure

Engineering and implementation of the secondary fluid network connecting the CDU cooling infrastructure through a coordinated piping distribution system.

02. Piping & Accessories

Approximately 2.5 km of piping, including associated piping accessories required for the secondary coolant distribution network.

03. On-Site Execution

On-site execution of the secondary fluid network, ensuring coordinated installation and integration with the overall data centre infrastructure.

04. BIM Modelling & Coordination

LOD 400 BIM modelling to support detailed engineering, spatial coordination and installation planning.

05. Multidisciplinary Clash Detection

Comprehensive clash detection to identify and resolve potential conflicts between the secondary fluid network and other building services.

06. Digital Project Collaboration

Utilization of Autodesk Construction Cloud (ACC) for collaborative project coordination, model sharing, and multidisciplinary integration.

Engineering the Future of Liquid Cooling

Planning a High-Capacity Data Centre Liquid Cooling Project?

Explore how SFN Solutions can support your CDU secondary fluid network requirements through engineering, BIM coordination and on-site execution.